Oversize and wide-load trucking
Nationwide dispatch, permits handled, escort coordination end-to-end.
Heavy Haul Now provides heavy-equipment transport, oversize-load trucking, and superload service in Corpus Christi and the Coastal Bend region. The Port of Corpus Christi is the third-largest port in the United States by total tonnage and the nation's leading crude oil export port. Combined with refinery operations, steel manufacturing at the new Steel Dynamics mill, and LNG export terminal construction, the region generates substantial demand for specialized heavy-haul service.
Dispatch
24/7 dispatch available
Response
< 15 min
Insurance
$1M cargo
Max load
200,000 lb
Capabilities
Nationwide dispatch, permits handled, escort coordination end-to-end.
Nationwide dispatch, permits handled, escort coordination end-to-end.
Nationwide dispatch, permits handled, escort coordination end-to-end.
Nationwide dispatch, permits handled, escort coordination end-to-end.
Nationwide dispatch, permits handled, escort coordination end-to-end.
Nationwide dispatch, permits handled, escort coordination end-to-end.
Nationwide dispatch, permits handled, escort coordination end-to-end.
Nationwide dispatch, permits handled, escort coordination end-to-end.
Nationwide dispatch, permits handled, escort coordination end-to-end.
Nationwide dispatch, permits handled, escort coordination end-to-end.
Nationwide dispatch, permits handled, escort coordination end-to-end.
Nationwide dispatch, permits handled, escort coordination end-to-end.
Heavy Haul Now provides oversize transport for the Port of Corpus Christi's commercial and energy cargo, the Coastal Bend's refinery corridor, and industrial facilities including the new Steel Dynamics mill.
The Port of Corpus Christi is the nation's top crude oil export port and third-largest by total tonnage. The $2.1 billion SDI steel mill and Cheniere LNG expansion add industrial depth that generates year-round heavy-haul transport demand.
Port breakbulk, refinery vessels, steel mill equipment, and LNG modules each require specific trailer configurations matched to weight, dimensions, and loading method.
I-37 connects Corpus Christi to San Antonio (145 mi north). US-181 serves the port's inner harbor. SH-358 (South Padre Island Drive/SPID) is the primary east-west urban arterial. SH-35 provides coastal access. Harbor Island facilities require bridge-crossing coordination.
Standard TxDMV rules apply. Port of Corpus Christi and refinery facilities require additional access coordination. The Harbor Bridge construction zone may affect routing.
I-37 north to San Antonio connects to I-35 and I-10 for nationwide distribution. US-77 south connects to the Rio Grande Valley and Mexico border crossings.
The Port of Corpus Christi handles international breakbulk, project cargo, and crude oil exports. Equipment imports arriving by vessel require heavy-haul drayage to final destinations.
Escorts: TxDMV standard. Port and refinery facilities require access coordination.
Flatbed
Steel coil and pipe from SDI mill and port to distribution
Step Deck
Mid-height refinery and processing equipment
RGN
Excavators and dozers for port expansion and Harbor Bridge project
Lowboy
Cranes to refinery turnaround and LNG construction sites
Double Drop
Transformers from port to utility substations
Multi-Axle
LNG modules and heavy refinery vessels from port berths
Local intelligence
Energy Export: Port of Corpus Christi crude oil and LNG export operations. Steel Manufacturing: SDI $2.1B flat-rolled steel mill on Harbor Island. Petroleum Refining: CITGO, Flint Hills Resources, Valero. LNG: Cheniere Corpus Christi LNG terminal. Construction: Harbor Bridge replacement, port expansion, industrial growth. Military: Naval Air Station Corpus Christi.
Port of Corpus Christi is the 3rd-largest U.S. port by tonnage. Multiple oil docks, bulk terminals, and the La Quinta Ship Channel serve the inner and outer harbor. Union Pacific provides freight rail. Corpus Christi International Airport handles cargo.
Harbor Bridge replacement construction zone affects north-side port access. Harbor Island bridge has load limits. Coastal roads vulnerable to storm surge. Port approach roads require scheduling. SPID (SH-358) congestion during peak hours.
Corpus Christi is in the Gulf hurricane zone. Hurricane Harvey in 2017 made landfall nearby. Storm surge can flood port areas and coastal roads. High winds off Corpus Christi Bay affect tall loads. Salt-air conditions require corrosion-aware securement. Heavy Haul Now has hurricane contingency protocols.
Refinery vessels and turnaround equipment. Steel mill production machinery and components. LNG terminal modules and process equipment. Port breakbulk cargo. Construction equipment for port expansion and Harbor Bridge project. Pipeline equipment for Coastal Bend corridors.
Steel Dynamics required a 155,000-lb electric arc furnace transformer delivered from the Port of Corpus Christi to its new flat-rolled steel mill on Harbor Island.
Industry
Steel Manufacturing
Origin
Port of Corpus Christi, La Quinta Terminal
Destination
SDI flat-rolled steel mill, Harbor Island, Corpus Christi, TX
Cargo
Electric arc furnace transformer
Weight
155,000 lbs
Trailer
9-axle double-drop
Timeline
5 days planning + 1 day transport
challenge
The La Quinta Channel Bridge to Harbor Island has load limits requiring axle-load verification. Wind conditions off Corpus Christi Bay can delay bridge crossings for tall loads. Transformer required precision placement at the mill.
solution
Verified bridge load capacity with port authority. Monitored wind conditions. Scheduled calm-weather window for bridge crossing. Coordinated mill-site crane for precision placement.
result
Delivered on schedule. Mill construction timeline maintained.
Why brokers & shippers choose us
Contiguous states served
Cities dispatched daily
Cargo insurance
Live dispatch
Port of Corpus Christi terminal coordination. Refinery and LNG facility access expertise. Steel mill logistics experience. TxDMV permits. Hurricane-season protocols. GPS-tracked delivery.
Coverage network
Questions answered
Yes. We coordinate terminal access, crane loading, TxDMV permits, and delivery from port berths to refineries, the SDI mill, LNG terminals, and destinations nationwide.
TxDMV issues permits. Port and refinery facilities require access scheduling. The Harbor Bridge construction zone may affect routing. We handle all coordination.
I-37, US-181, SH-358 (SPID), SH-35, SH-44, and US-77. Harbor Island access requires bridge-crossing coordination.
Yes. LNG modules, process vessels, and construction equipment for Cheniere and other terminals. Multi-axle and SPMT configurations available.
The Coastal Bend is in the hurricane zone. Storm surge, flooding, and high winds can delay operations. We have contingency protocols and monitor NWS advisories.
Yes. I-37 north to San Antonio connects to I-35 and I-10. Multi-state permits and GPS tracking included.
Yes. We coordinate Harbor Island bridge crossings, port terminal access, and mill-site delivery for SDI's flat-rolled steel mill.
Standard: 2-5 days. Super Heavy permits may need additional weeks. Emergency transport may be available.
Cargo, weight, dimensions, port berth or pickup location, destination, timeline, and facility access requirements.
Yes. US-77 south to Brownsville or I-37 to I-35 to Laredo. Customs-broker coordination included.
Talk to a live dispatcher now — permits, escorts, and routing handled.