Loading and rigging
Transformers and switchgear typically require crane loading rather than drive-on methods, with rigging points and lift plans specific to the unit's weight and center of gravity. Utility sites often provide their own crane or rigging crew, so coordination confirms who supplies lift equipment at both the manufacturing plant and the substation before the move is scheduled.